AIC
ClientProjectDescriptionYear
Sequel, Prai   Completed entire M & E design of a disk drive repair factory of approximately 25,000 sq. ft. Services include the design of a Class 1,000 Cleanroom, air conditioning, ventilation, electrical, fire protection and utilities services. 1996
R. Frazier   Completed the entire M & E design for a 20,000 sq. ft. factory and involve in rework and salvaging of electronic parts. 1997
Nitcom Technology   Completed the M & E services for a SMT/Cleanroom Sub Assembly factory of 40,000 sq. ft. Services include air conditioning, ventilation, electrical, cleanroom (Class 10,000 and 100,000), fire protection and utilities. 1996
AIC Semi-conductor, Kulim Phase 2 Completed the entire M & E works of Phase 2 expansion. The work include Class 10K Cleanroom as well as air conditioning and ventilation services, utilities like RODI, OFA, Vacuum, Process Cooling Water, RODI, Waste Water Treatment etc., fire protection services, electrical services (H.T. & L.T.). Total floor area is approximately 75,000 sq. ft. 2000-2001